All the Ruby June Panels Together at the Value Pass Stage

I arranged all the panels in my studio to get a sense of how things looked together.  I needed to see if there were any glaring issues with values not looking right together before gelling everything and getting started on my base colors.  As you can see, I already have 2 of the panels painted though I will probably be touching up at least one of them.  It was that second panel that I painted that I wasn’t overly happy with and decided I needed to paint all the panels together to keep consistency in color.  I started gelling over the panels three days ago and have all but five done as of this post.  I will finish them up tomorrow though will probably have to wait for a little before starting on my base colors so the gel can dry.  I certainly don’t want to jump the gun.

Ruby June value pass panels